"We want to open before Christmas." The five words that can make a renovation more expensive.
It's the same every year. The holiday season is approaching, brands want to renovate their stores, open new locations, and have everything ready to welcome their customers. And then the phrase appears: "We want to open before Christmas."
The problem isn't wanting to open in December. The problem is starting to plan when December is already too close.
When everything is urgent, everything costs more.
A commercial renovation requires coordinating materials, suppliers, installations, finishes, and various trades. When these decisions are made late, urgent purchases, extra deliveries, overtime, and last-minute changes arise.
And we're not just talking about perceptions. A study published by the American Society of Civil Engineers in 2026, based on actual project costs, identified that rework can represent, on average, 2% of the contracted value, including post-delivery adjustments. In some projects, the figure exceeded 7%.
Not all corrections are due to poor planning, but the data makes one thing clear: redoing a job has a cost that someone ends up paying.
Accelerating doesn't always mean moving faster
Adding more workers or extending working hours doesn't guarantee a faster finish. If the facilities aren't coordinated, the materials haven't arrived, or the furniture hasn't been finalized, it simply multiplies the problems.
Good execution begins long before the first worker arrives on site. It starts with a clear scope, timely decisions, advance purchasing, and realistic scheduling.
Planning doesn't eliminate all unforeseen events, but it prevents every unforeseen event from becoming an emergency.
Next Christmas is being planned before December

A store ready to open is not the product of a Christmas miracle. It is the result of timely decisions, coordination between specialties, and well-organized execution.
At SCRIPTUM we integrate design, planning and construction so that brands can transform their spaces with control over time, costs and quality.
If you're thinking about renovating a store, opening a new location, or preparing your next business project, let's talk before the calendar starts working against you.
It's also important to understand that the cost of a remodel doesn't end with the construction investment. A delayed opening can affect the business schedule, launch campaigns, staffing, and, above all, the number of operating days the brand had planned. Therefore, choosing a team solely based on their execution capabilities or the price of their quote can be an incomplete decision. Experience in planning, coordinating, and managing construction can make a significant difference between a project that simply gets finished and one that achieves its business objectives.
Because being on time is important. But being on time without blowing the budget is much better.
Last-minute changes
Modifying materials, finishes, dimensions, or construction solutions once a project is underway can have a much greater impact than it might seem. A decision that can be resolved in minutes on the blueprints can, on-site, involve dismantling finished elements, wasting materials, rehiring labor, and rescheduling other suppliers.
Furthermore, each modification can generate a chain reaction on subsequent activities, causing delays that ultimately compromise the opening date.
Therefore, defining the details correctly before starting is not bureaucracy or a waste of time: it is one of the best ways to protect the budget and prevent hasty decisions from ending up costing you dearly.
Scriptum | Planning, technical expertise and commitment in every project.
Learn about our services at scriptum.gt .
Source: American Society of Civil Engineers (ASCE), January 2026. Research on the actual costs of correcting construction projects.








Comments